619 planning applications were published this week across 25 counties. Together they state 462 units, and 418 link to the council's own file. Each shows the date it was received.
Largest applications this week
By units statedAll applications this week
258 records48, Saint Lawrence Road, Clontarf, Dublin 3
PROTECTED STRUCTURE: RETENTION & PERMISSION: Retention permission and planning permission is sought at 48 St. Lawrence Road, Clontarf, Dublin 3, D03 HN62, A PROTECTED STRUCTURE. The development will consist of: Retention Permission for: instatement of vehicle access gate to the street. Permission for: Demolition of existing single-storey lean-to structures at rear of the return and shed at party wall. Construction of: single storey extension to rear with solar panel array to new flat roof; roofed bike store to side passage; and shed and pergola to rear garden. Replacement of: all non-original windows with double glazed timber sash windows. In addition:- To front elevation: install double doors to porch to form draught lobby; rake out cementitious mortar and repoint existing brickwork with lime mortar; replace sheeted side gate with painted sheeted timber gate; temporarily remove (to allow construction access) and reinstate lintel over gate. To side elevation: remove existing cementitious render and apply lime render. To side elevation (return): block up existing side door; remove 1no. window and widen opening to form doorway; remove existing cementitious render and apply lime render. To rear elevation: remove existing cementitious render and apply lime render. To rear elevation (return): remove existing cementitious render and apply lime render. At roof level: install 1no. new rooflight to return side roof; carry out repairs to timber barging; replace any PVC guttering and downpipes with painted metal; carry out repairs to chimneys and replace flashings where required. Internally: make layout changes including structural openings at: ground floor level, return at ground and first floor levels; new breathable floor slab with underfloor heating at ground floor level, remove existing plaster to internal face of external walls and apply same depth cork-lime mix with lime plaster finishing coat (all decorative plaster to remain in situ), lime plaster repairs to ceiling and internal wall plaster. Generally: strip all plumbing/heating and electrical services and install all new systems, remove non-original fittings, install new fittings and redecorate, and any associated repairs, drainage works and builder’s works.
43, Heytesbury Lane, Dublin 4, D04 H0X2
PROTECTED STRUCTURE: Development at No. 43 Heytesbury Lane, Dublin 4, D04 H0X2, (within the curtilage of a Protected Structure). The development will consist of: a) the demolition of the existing outbuilding to rear, b) the construction of a 2sqm two-storey extension to the front, c) the construction of a 32sqm two-storey extension to the rear, d) a new west facing dormer window to the attic level, e) internal alterations, elevational modifications and general refurbishment, f) widening of the existing vehicular entrance to 3.5m, g) new patio to rear and associated site works & landscaping.
7, Clonshaugh Rise, Dublin 17
Development will consist of a new ground floor only extension attached to the existing extension to the rear of the existing house and all ancillary works.
Parkview, Ballymun, Dublin 11, is bound by Parkview Road to the north; nos. 58, 59 and 60 Parkview Grove to the west; nos. 16, 17 and 18 Oakwood Close and open space incl
We Ó Cualann Cohousing Alliance CLG intend to apply for planning permission for development comprising amendments to a permitted development under DCC Reg. Ref. 5252/22 (An Bord Pleanála, ABP, Ref. ABP-317818-23) at the site, Parkview, Ballymun, Dublin 11. The site extends to approximately 0.26 ha and is bound by Parkview Road to the north; nos. 58, 59 and 60 Parkview Grove to the west; nos. 16, 17 and 18 Oakwood Close and open space including mature trees to the south; and brownfield lands to the east. The development will consist of: [1] The removal of the previously permitted crèche, sheltered housing, associated car parking, and related works permitted by Reg. Ref. DCC-5252/22 (ABP Ref. ABP-317818-23); [2] The replacement with and construction of 12 no. affordable houses comprising 4 no. two-storey semi-detached units (House Type B1), and 8 no. two storey terraced units (House Type B) with front and rear gardens, 12 no. car parking spaces, bin storage, public footpath, landscaping, boundary treatments (wall, steel railings, post and timber fencing) and all associated and ancillary site development works, including services infrastructure, above and below ground.
10, Idrone Terrace, Blackrock, Dublin, A94C3C2 (Protected Structure)
The development will consist of: The refurbishment and restoration of several e
Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven)
PROTECTED STRUCTURE: Rectone Developments Ltd intend to apply for PERMISSION for a residential development comprising 30 no. units, on a site of c. 0.476 ha., on lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven). Balnagowan House is a Protected Structure (RPS Ref. No. 8699). The development will consist of: the demolition of 3 no. existing single storey outbuilding structures (total of 171.5 sq. m) together with part removal of the front existing boundary walls; the change of use of Balnagowan House (Block 1) from office to residential use to provide 4 no. 2 bed residential units (c.354.67 sq.m GFA), together with associated internal and external alterations and refurbishment works to facilitate the conversion (including removal of internal walls/partitions); the construction of a 3 storey duplex & apartment block (Block 2) to provide 4 no. 1 & 3 bed residential units with associated balconies & terraces; & the construction of 22 no. 2 & 3 bedroom 3 storey townhouses with associated private open spaces & balconies, to provide 30 no. residential units (c. 2365.9 sq. m GFA). The overall proposed residential development (c. 3099.81 sq.m GFA) (including Balnagowan House), will comprise 2 no. one bedroom units, 6 no. two bedroom units, & 22 no. three bedroom units. Pedestrian, cyclist, vehicular and emergency access will be provided off The Haven/ St. Mobhi Boithirin via. existing upgraded entrances. The access arrangements include alterations to the existing accesses to front & to the west of Balnagowan House, St. Mobhi Boithirin. The development will also consist of open space provision including all private, communal and public open space, hard and soft landscaping including internal cycle and pedestrian routes, pathways, boundary treatments, as well as a playground of 50sqm within the communal open area, street furniture, car parking (14 no. part internal gnd. fl. garage spaces to the townhouses & 14 no. surface spaces – 2 no. accessible & 5 no. EV charging – with 9 no. of the spaces accessed directly from St. Mobhi Boithirin), bicycle parking (16 no. long & 4 short stay spaces, covered and secure bicycle parking), ESB substations, piped infrastructural services & connections, ducting, plant, waste management & bin store provision, SuDS & attenuation infrastructure, signage, public lighting and all site development incl. all excavation works & service connections. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
37, Kilbarron Park, Coolock, Dublin 5
RETENTION PERMISSION; For the erection of a single storey garden room and office space to the rear of the existing dwelling at 37 Kilbarron Park, Coolock, Dublin 5.
Adavoyle, Sandyford Road, Dundrum, Dublin, D16C1Y2
Construction of a new lean-to roof rear extension to connect to the existing lea
4, Elmfield Court, Clarehall, Dublin 13
Construction of single storey extension to the front of existing dwelling comprising of hall and living room extension and all associated site works.
28, Newbury Grove, Clonshaugh, Dublin 17, D17 W310
The development will consist of an attic conversion including a rear dormer roof extension, 3 No. rooflights to the front elevation, new internal access stairs and all associated site works.
24, Daniel Street, Portobello, Dublin 8, D08 E4P1
The demolition of the existing single-storey rear annex, the construction of a new two-storey flat-roofed extension to the rear of the existing dwelling, an increase in the existing ridge height, the provision of three no. rooflights to the pitched and flat roof surfaces, internal renovations to the existing dwelling including alterations to the existing ground-floor level, minor elevational amendments and all associated works at 24 Daniel Street, Portobello, Dublin 8, D08 E4P1.
University College Dublin Boat Club, Chapelizod Road, Dublin 8
(i) the extension of the existing concrete slipway by approximately 20 metres with a concrete slipway; (ii) the construction of a miniature rowing training pool comprising a precast reinforced concrete box structure measuring approximately 2.9m long × 1.9m wide × 1.2m deep with 200mm thick walls, including crushed stone infill; (iii) the construction of an inland rowing training tank comprising an approximately 800mm deep water-filled tank with rounded internal corners, constructed using a combination of reinforced concrete, GRP and/or plastic liner systems with watertight rendered internal walls; (iv) installation of operational two lighting poles with adequate lux levels to serve the proposed facilities; (v) removal of approximately 28 metres of existing riverbank vegetation; and (vi) all associated site development works, drainage, landscaping and ancillary works necessary to facilitate the development. (vii) The Proposed Development application area comprises a site of c. 0.12 ha.
16, Parnell Road, Dublin 12, D12 DX54
PROTECTED STRUCTURE: Permission is sought for construction of two semi-detached, two storey, 3 bedroomed, mews houses with front and rear balcony and terraces to the rear lands within the curtilage of the existing Protected Structure accessed off Hatter’s Lane including all associated site and removal works at No. 16 Parnell Road, Dublin 12, D12 DX54 by Padraic Ryan and Beth Maguire. (Re-submission of Previously Granted Application Reg. Ref. 2212/20).
c.1.34 ha site located at the junction of North Wall Quay and New Wapping Street, Salesforce Tower, Station Square, Block 7, Spencer Dock, Dublin 1
PROTECTED STRUCTURE: SFDC Ireland Ltd. intend to apply for planning permission for development at this c.1.34 ha site located at the junction of North Wall Quay and New Wapping Street, Salesforce Tower, Station Square, Block 7, Spencer Dock, Dublin 1. The application site includes the former British Rail Hotel on 58-59 North Wall Quay, a protected structure (RPS 5838), and its associated granite walls, railings, gates, and adjoining setts in cul-de-sac, which are also protected structures (RPS 5839). The application relates to a proposed development within the North Lotts & Grand Canal Dock SDZ Planning Scheme Area. Planning permission is sought for 1 No. ventilation louvre panel measuring 4.15m in height and 1.5m in width, to be affixed to the western façade of Building B1 at ground floor level for the purpose of providing ventilation to the existing retail unit, and all associated works above and below ground.
119 Ardlea Road, Dublin 5, D05 K3C6
The development will consist of a partial ground floor only extension added to the existing extension to the rear of the existing house. The blocking of 1No. window & door at ground level on side elevation and to be replaced with 2No. new windows & 1No. door. A new flat roof dormer to the rear of the existing house roof. 1 No. new velux window to the front & side of the existing house roof. The window on front elevation ground level to be raised inline with window & door of existing house. Existing chimney to the side elevation to be demolished and all ancillary works.
47, Tolka Estate, Glasnevin, Dublin 11, D11 V6K2
We, Nathan Sherman and Ciara Cavanagh, intend to apply for Planning Permission for development at this site: 47 Tolka Estate, Glasnevin, Dublin 11, D11 V6K2.The development will consist of the construction of a first floor extension over the existing single storey rear extension to provide an additional bedroom and all associated site works.
Units 1 & 2,107 Dorset Street Upper, Dublin 1
The installation of 2 no. external roller shutters to the front elevation, serving 2 no. shopfront openings, fixed to the masonry façade above the shopfronts, together with all associated works.
47 Avondale Park, Raheny, Dublin 5, D05 A448
Planning permission is sought for a new vehicular access with ancillary site works.
8, Bremen Avenue, Irishtown, Dublin 4
Permission for attic level dormer structures to the front and rear slopes of the main roof.
88, Moyne Road, Ranelagh, Dublin 6, D06Y368
PROTECTED STRUCTURE: RETENTION & PERMISSION: The development will consist of the following retention revisions to the previously granted Planning Permission Register Ref. 4307/24: i. Retention of the removal of an existing chimney breast to the rear living room at ground floor level only and associated internal and external layout revisions to the rear of the property. ii. Permission for the reinstatement of an original pedestrian access gate to the rear laneway, along with all associated site works.
214, Collins Avenue East, Donnycarney, Dublin 5
RETENTION AND PERMISSION: The development will consist of 1) Retention Permission for existing vehicular access to off street parking and 2) Planning Permission for new single storey extension to side and rear of property and new rooflight to side of existing 1nd floor roof.
AIB Bank, Howth Road, Dublin 5
a) Relocation of the existing ATM on the South Elevation and associated works b) Modification of 2 no. existing windows at Ground Floor Level on the South and East elevations c) Removal of 2 no. illuminated signage boxes on the South Elevation
156, Kildare Road, Dublin 12, D12W9A0
Provision of 1 no. new two storey detached 3 bedroom dwelling house (floor area 112.73 sq.m.) to the side garden with associated altered vehicle and new pedestrian entrance and ancillary site works. Modification works to existing house comprise new vehicle and altered pedestrian entrances and sundry associated works.
24, Hazelbrook Drive, Terenure, Dublin 6 West
We Lisa Murphy and Daragh Boyd wish to apply for Planning permission for the construction of a single storey flat roofed extension to the rear of dwelling and all associated site works at 24 Hazelbrook Drive, Terenure Dublin 6 West D6WAK74. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of Dublin City Council, Planning Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8 during its public opening hours (9.00a.m.- 4.30p.m.). A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee (€20.00) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.
26, Westfield Road, Harold's Cross, Dublin 6w, D6W N242
RETENTION: Retention of the ground floor level rear window to the garden room at the rear of 26 Westfield Rd, Harold's Cross, Dublin, D6W N242.
land at side of 31 Reuben Avenue (D08 E9E4), and rear of 29 Church Avenue South (D08 P2P7) Dublin 8, D08 E9E4
The development will consist of changes to the previously approved development of a one off house, ref WEB2483/25, to incorporate a new dormer to the rear roof slope of the new previously approved dwelling, and a new pedestrian gate to retain access from the rear garden of 29 Church Avenue South onto Reuben Avenue.
16, Northumberland Court, Northumberland Road, Dublin 4
The development will consist of the construction of a 2 -storey extension to the rear and a single storey side extension and internal alterations to the existing 2 – storey end terrace house to provide additional 26 m2 of living and storage accommodation at ground floor level and an additional 18.4 m2 of bedroom and bathroom accommodation at first floor level and all associated site works.
107, Larkfield Gardens, Kimmage, Dublin 6W D6WXV77
The development will consist of the removal of the roof of an existing rear single storey extension, the construction of a two storey rear extension over part of the existing single storey extension and all associated works.
92a Harolds Cross Road, /St. Clares Avenue, Dublin 6W
The development consists of; Proposed amendments to the granted permission Reg Ref. 3266/21 which has commenced onsite to a point, save for the changes sought by this new application. This new application consists of (i) The construction of an urban infill apartment scheme comprising of 3 no. two-storey, flat/green roofed blocks, containing 5 no. one-bedroom units and 1 no. two-bedroom unit. Each apartment is served by private terraces/ balconies; (ii) provision of 10 no. bicycle parking/storage spaces (inclusive of 7 no. long-stay and 3 no. short-stay spaces); and (iii) all ancillary site works including site clearance, boundary treatments, SUDS measures, landscaping, provision of bin stores, and provision of 4 no. rooflights, as necessary for the development. Access to all units will be via St. Clare's Avenue including access to first floor units via 2 no. shared external stair cores.
404, Clontarf Road, Clontarf, Dublin 3, D03 W016
Planning Permission is sought by Laura & Peter Mulvaney for the following works: (i) Demolition of existing ground floor sun room extension (11.5m2 in area) & rear/side chimney stack at roof level (ii) Construction of a new part single storey part two storey extension (106m2 in area) to the rear of existing dwelling with flat roofs & rooflights (iii) Construction of a new flat roof attic dormer and installation of a velux rooflight to the side elevation of existing main pitched roof (iv) Construction of new single storey porch extension to the front elevation with flat roof (1m2 in area) (v) Alterations to existing front & rear elevations to include enlargement of windows at attic level (vi) Widening of existing vehicular entrance onto Clontarf Road (vii) Construction of a new single storey ancillary garden room / gym (32.5m2 in area) with flat roof in the rear garden (viii) all associated site, landscaping & drainage works necessary to facilitate the development all at 404 Clontarf Road, Clontarf, D03 W016
19 The Grove, Bettyglen, Dublin 5, D05 P825
The development will consist of the erection of a side and rear single storey extension with a part flat part mono pitched roof. Relocation of existing front door. New entrance canopy. New external insulation to existing walls. Removal of store to side of house. Internal alterations to provide new open plan layout to rear, and WC at ground level. New pedestrian access to rear garden. All associated landscaping, new boundary treatments, drainage, ancillary site works and services.
87, Rossmore Road, Dublin 10, D10 V562
The development will consist of; Proposed Ground and first floor extension to the rear and side of existing end of terrace dwelling and all associated site works @. No. 87 Rossmore Road, Dublin 10 D10 V562
Clontarf Cricket Club, Castle Avenue, Dublin 3, D03 K4K3
The development will consist of: (i) replacement of the pitched roof to existing single-storey clubhouse with a new flat roof, which will form a viewing terrace; (ii) construction of new external stairs; (iii) alterations to elevations; (iv) internal layout changes; (v) signage to front (west) elevation; (vi) all ground and ancillary works inclusive of soft and hard landscaping as necessary to facilitate the development.
A c. 0.03 Ha site located on Saint Michan’s Street, Dublin 7., The site is generally bound: to the east by Saint Michan’s Street; to the south and west by Fegan’s, No. 13
Atria Living Limited intends to apply for permission for development at this c. 0.03 Ha site located on Saint Michan’s Street, Dublin 7. The site is generally bound: to the east by Saint Michan’s Street; to the south and west by Fegan’s, No. 13–18 Chancery Street and No. 1–1a Saint Michan’s Place; and to the north by a car park. The development will principally consist of the construction of a part 7 No. to part 8 No. storey (including mezzanine level) hotel (c. 1,863 sq m), providing 48 No. bedrooms. The development will also include: a restaurant/bar (c. 80 sq m) at ground floor level; a roof terrace (c. 81 sq m) at seventh floor level facing east, south and west; a guest lounge (c. 43 sq m) and library (c. 36 sq m) at seventh floor level; bicycle parking; bin store; hard and soft landscaping; signage; plant; lift overrun; green/blue roof; and all other associated site works above and below ground.
Site of approximately 0.019 Ha at No. 4 Rere of Arbourfield Terrace, Dundrum Road, Dublin 14, D14 FP63
The proposed development will principally consist of: the demolition of the exi
29 Convent Road, Dalkey, Co. Dublin, A96A9W4 - ACA
(1) The removal of the existing conservatory to the rear of the existing house
3, Green Park, Orwell Road, Dublin14, D14YW02
Construction of a Single story extension to the side & rear of existing detache
49, Willow Park Crescent, Dublin 11, D11VF40
RETENTION: The development seeking retention permission will consist of alterations to the front (north) elevation materials, repositioning of the existing house entrance, fenestration alterations along the front (north) façade and the side (eastern) façade of the main house, removal of chimney on the side (eastern) façade and rooflight to the side of the main house and all associated site works.
52, Garville Avenue, Rathgar, Dublin 6, D06RD35
PROTECTED STRUCTURE: Construction of a new 1 & 2-storey detached single-family private dwelling house in the rear curtilage of the existing house, with vehicular access via the existing gate to Rathgar Avenue. No works are proposed to the fabric of the existing house.
24, Grange Park Grove, Dublin 5
Planning Permission sought for: 1. The demolition of the existing single storey timber structure to the side of the existing house at No.24 Grange Park Grove. Plus the removal of garden walls 2 The construction of a new infill Single Storey, 2 bedroom detached house to the side / rear of No.24 Grange Park Grove. Plus All Associated Site Works including alterations to the front garden and widening the existing vehicle and pedestrian entrance
13, Northumberland Road, Ballsbridge, Dublin 4, D04 X243
PROTECTED STRUCTURE: The fitting of Solar panels to the front, rear and valley and hip slopes of the main double pitched roof and valley of the two-storey and single-storey Returns; the following works to the front façade: cleaning the render, cleaning the granite steps, string course and coping stones and repainting painted patent cement reveals and granite cills to windows to this three storey over garden level residential building at 13 Northumberland Road, Ballsbridge, Dublin 4, D04 X243 by Riverwalk Estates Limited. This is a Protected Structure.
Site to rear of 13 Windsor Avenue, on Windsor Lane, Fairview, Dublin 3
The provision of a 61sqm, 1-bed with attic room, 2 & ½ -storey mews dwelling, with single-storey element against rear boundary. Slate pitched roof to main mews and standing seam zinc roof to rear single-storey element and white brick external finish facing laneway, with undercroft car and bicycle parking.
54, Raglan Lane, Dublin 4
The development will consist of (i) removal of existing front boundary wall, pedestrian gate and vehicular gate fronting on to Raglan Lane. (ii) Construction of a new boundary wall, pedestrian gate and vehicular gate fronting on to Raglan Lane. (iii) All associated site works necessary to facilitate the works.
7, Coolatree Road, Beaumont, Dublin 9, D09W861
Planning permission to remove existing street tree to enable the widening of the existing pedestrian entrance in order to create a new vehicular entrance that will facilitate off street parking and EV charging
3 Taney Park, Dundrum, Dublin 14, D14HW08
The construction of a 3-bedroom detached house, with new site entrance to exist
93-95 Terenure Road East, Terenure, Dublin, D06 V3F4
Change of use from Bank to Medical Centre consisting of 5 consultation rooms and all associated internal works. Additional upgrading to the front façade is proposed as well.
43 Montpelier Gardens, Dublin 7, D07 E205
Full planning permission for the alterations & extensions to my dwelling with approx. 20.7sqm extension to ground floor to the north (rear) elevation and for the removal of the chimney to the rear of the property, together with all associated and ancillary site works @ 43 Montpelier Gardens, Dublin 7, Co. Dublin, D07 E205
22 VERNON AVENUE, CLONTARF, DUBLIN 3
We, Tara Carr and Rohan Butler intend to apply for Planning Permission for a rear 2-storey extension, alterations to front and rear elevation and a new front vehicular entrance at 22 Vernon Avenue, Clontarf, Dublin, D03 DD54.
92a, Harold's Cross Road/St. Clares Avenue, Dublin 6w
The development consists of; Proposed amendments to the granted permission Reg Ref. 3266/21 which has commenced onsite to a point, save for the changes sought by this new application. This new application consists of (i) The construction of an urban infill apartment scheme comprising of 3 no. two-storey, flat/green roofed blocks, containing 5 no. one-bedroom units and 1 no. two-bedroom unit. Each apartment is served by private terraces/ balconies; (ii) provision of 10 no. bicycle parking/storage spaces (inclusive of 7 no. long-stay and 3 no. short-stay spaces); and (iii) all ancillary site works including site clearance, boundary treatments, SUDS measures, landscaping, provision of bin stores, and provision of 4 no. rooflights, as necessary for the development. Access to all units will be via St. Clare's Avenue including access to first floor units via 2 no. shared external stair cores.
201, Glasnevin Avenue, Glasnevin, Dublin 11
Amendments to the front boundary wall onto Glasnevin Avenue to include the construction of a new brick pier to match the existing pier and reduction of the vehicular opening onto Glasnevin Avenue.
How this is counted
The largest applications are ranked by the units each one states; applications that state only a floor area are not ranked with them. An application belongs to the week it was published; the date it was received is shown separately. Figures cover 27 Jul 2026–2 Aug 2026.