Applications were most often refused because the proposal did not fit its site or surroundings, conflicted with zoning or rural-housing policy, created access or road-safety problems, harmed the amenity of neighbouring homes or involved unauthorised works or retention.

20 of 51 records carry official reason text

30 published statements, 1.5 per analysed application

7 refused on more than one ground, up to 3

Most common pairs

  1. 7 Design + Zoning/policy
  2. 7 Residential amenity + Zoning/policy
  3. 6 Design + Residential amenity

All ten refusal themes

Applications · statements
  1. 01 Design, scale, character or visual impact 12
  2. 02 Zoning, land use, settlement policy or rural housing need 10
  3. 03 Traffic, access, parking or road safety 9
  4. 04 Residential amenity, privacy, light or noise 9
  5. 05 Unauthorised development, retention or procedural history 6
  6. 06 Ecology, habitats or Natura impacts 3
  7. 07 Missing or insufficient evidence, surveys or technical detail 3
  8. 08 Built heritage or archaeology 2
  9. 09 Wastewater, effluent, groundwater or public health 1
  10. 10 Surface-water drainage or flood risk 0

Refusals published 27 Jul 2026–2 Aug 2026

3 of 3 matching records shown

Refused

Ramsgrange, Rathroe, Wexford

Ramsgrange, Rathroe

Wexford County Council · 20260485

What was proposed

Permission for the erection of a fully serviced dwellinghouse and all associated

Refusal reason

The applicant has failed to demonstrate that the proposed waste water treatment system can be accommodated on this site and as such the proposed development is prejudicial to public health and contrary to the proper planning and sustainable development of the area.

Official decision evidence
Refused

Ballybeg, Ballybeg, Wexford

Ballybeg, Ballybeg

Wexford County Council · 20260678

What was proposed

Permission for the construction of a new single storey detached house

Refusal reasons
  1. The applicant has failed to adequately demonstrate rural linkage and housing need in accordance with the rural housing policy as set out in Volume 1 Table 4.6 of the Wexford County Development Plan 2022- 2028. It is a requirement that the applicant must have lived in this Uplands Landscape for a minimum period of 10 years and that the site is within 3 km radius of where the applicant has previously lived or is currently living. No supporting documentation has been submitted. The proposal is therefore contrary to the proper planning and the sustainable development of the area.
  2. It is the policy of the Council to ensure that developments are appropriately designed and sited to preserve the rural character and visual amenities of the surrounding landscape. The proposed prefabricated timber home (log cabin) by reason of its form, design and characteristics of an alpine dwelling is considered out of character with this rural area and landscape having regard to its setting and character of existing development in the vicinity. The proposed development would likely result in a negative impact on the visual amenities and character of this rural area and would set a precedent for further development of this type within the rural landscape. The proposed development is therefore considered contrary to policies relating to rural design and siting set out in Section 3.1 of Volume 2 of the Wexford County Development Plan 2022-2028 and contrary to the proper planning and sustainable development of the rural area.
Official decision evidence
Refused

Monbeg, Ballindaggan, Wexford

Monbeg, Ballindaggan

Wexford County Council · 20210761

What was proposed

Permission to construct a fully serviced dwelling house with associated site wor

Refusal reason

Under Section 7 of the Planning and Development (Amendment) Act 2021, Section 42(B) of the Planning and Development Act 2000, the Planning Authority shall as regards a particular permission, extend the appropriate period, by such additional period as the authority considers requisite to enable the development to which the permission relates to be completed, if each of the requirements under Section 42(B) are complied with. Having regard to the above and all the details submitted, this application for a Section 42(B) extension of duration is refused.