Connections checked 5 September 2026. Dates below describe this edition’s events; open the planning case for its linked history and later records. See this week on the map.

Latest commencement records.

307 observed so far · Minimum observed; final count not yet available.

307 commencement notices have declared commencement dates in this ReportingWeek and match to 287 PlanningBrief projects. The count follows the official notice date, not PlanningBrief's ingest timestamp.

31 Aug 2026–6 Sep 2026 ReportingWeek307 notices published307 source-link records307 matched notices26 counties945 notice / phase units

Largest matched commencement projects

Matched projects · non-additive project value

All commencement notices in the latest BCMS update

307 matching records

Dublin, Dublin

DublinDún-Laoghaire Rathdown County CouncilCN0146710DRPlanning ref D25A/0879/WEB

Construction of a single-storey extension to the side, fore and rear of the existing two-storey semi-detached house, with a conversion of the attic with a dormer to the rear and 3 No. rooflights to the fore, porch extension to front, Installation of external insulation throughout, solar panels on the front roof, with ancillary site works to include replacement of existing front boundary hedgerow with 1m high brickwork wall, new gates, piers & widening of the driveway.

Declared commencement date 31 Aug 2026Declared commencement date 31 Aug 20261 units (phase)

Blackrock, Dublin

DublinDún-Laoghaire Rathdown County CouncilCN0146708DRPlanning ref D25A/0323/WEB

Demolition of existing single-storey garage to side. Demolition of existing block wall to side. Construction of new single-storey extension to rear and side with 1no. roof light. Amendments to glazing openings to rear elevation (east) to first floor and front elevation (west) to first floor and creation of new window ope to rear elevation (east) first floor. Proposed tile surround to front entry porch. Alterations to existing front boundary wall including relocation and widening of the existing vehicular access and provision of gates. Internal modifications, associated hard landscaping and all ancillary works.

Declared commencement date 31 Aug 2026Declared commencement date 31 Aug 2026

Dalkey, Dublin

DublinDún-Laoghaire Rathdown County CouncilCN0146692DRPlanning ref D25A/0693/WEB

The extension, refurbishment and internal remodelling of the existing two-storey, split level 3 bedroom house on the site to create a 4 bedroom, two storey splitlevel dwelling, over a new partial basement to the rear comprising: 1) the construction of a single storey flat roof extension at basement level to the rear (east) with a terrace deck on the roof and staircase to the rear garden; 2) the reconstruction and extension of the existing single storey extension at the side (south) abutting Queenstown Castle (protected structure: RPS 1544) including single storey extensions to the front (west) to provide a lightwell and to the rear (east) and the replacement of the existing roof with a green roof and parapet walls over the extended floor area; 3) the construction of two storey extensions to the front (west) and rear (east) of the existing two storey element of the house and the introduction of 2 no. balconies to the rear (east) at the first floor; 4) the replacement of the roof of the existing two storey element of the house with a green roof with parapet walls of the same height of the proposed front and rear extensions and the installation of solar PV panels; Page 2 of 9 95 - DEC1letter 5) the construction of a raised terrace adjacent to the extended kitchen at ground floor level to the rear (east); 6) the construction of a single storey bicycle store; 7) the widening of the existing vehicular entrance onto the access to Queenstown Castle (protected structure: RPS 1544), from 3.2 metres to 4.6 metres and the introduction of a pedestrian gate; and 8) all other site development works required to facilitate the development including hard and soft landscaping.

Declared commencement date 31 Aug 2026Declared commencement date 31 Aug 20261 units (phase)

Dungloe, Donegal

DonegalDonegal County CouncilCN0146689DLPlanning ref 25/50125

DEMOLITION OF FLAT ROOF PORCH TO THE REAR (7SQM), (2) CONSTRUCTION OF A PITCHED ROOF DOUBLE HEIGHT KITCHEN / DINING / LIVING ROOM TO REPLACE THE PORCH AT THE REAR, AND FIRST FLOOR MASTER BEDROOM ENSUITE WITH DORMER WINDOWS AND ALL ASSOCIATED SITE WORKS

Declared commencement date 31 Aug 2026Declared commencement date 31 Aug 20261 units (phase)

Dublin, Dublin

DublinDublin City CouncilCN0146681DCPlanning ref ABP-321931-25

Construction of 28 residential dwelling units consisting of 20 no. terraced houses and 8 no. Duplex Apartments (4 in Duplex Block No. 4 and 4 in Dublex Block No. 5)and all associated ancillary site works at Park West Avenue, Dublin 10.

Declared commencement date 31 Aug 2026Declared commencement date 31 Aug 202628 units (phase)

Dublin 5, Dublin

DublinDublin City CouncilCN0146665DCPlanning ref 3484/25

1)Proposed loft conversion including removal of hipped end of roof and the construction of an apex roof, also construction of a flat roof dormer structure with window to rear roof profile and window to gable end of house at loft level. 2)Construction of single storey flat roof extension to rear and side of house, also all associated site works.

Declared commencement date 31 Aug 2026Declared commencement date 31 Aug 2026

Dublin, Dublin

DublinDún-Laoghaire Rathdown County CouncilCN0146583DRPlanning ref D26A/0161/WEB

The development will consist of construction of - a first floor extension with a pitched roof over the existing side garage, a first-floor cantilevered extension with a flat roof to the rear, an attic conversion to habitable space with a rear dormer window and 2 no. Velux rooflights, a single-storey garden room with a flat roof to the rear, the relocation of an existing garden shed, widening of vehicular gate and associated site works.

Declared commencement date 31 Aug 2026Declared commencement date 31 Aug 20261 units (phase)

Kanturk, Cork

CorkCork County CouncilCN0146526CCPlanning ref 24.04066

Construction of a respite building, residential building, pedestrian bridge, stable block, covered lunging ring, the change of use of existing dwelling to canteen and store, refurbishment of existing stable blocks to include toilet facilities, the provision of play area, car park, equestrian riding circuit, sensory trails, walkways, installation of wastewater treatment systems, polishing filters, site lighting, revisions to existing entrance, provision of a new vehicular entrance, and all ancillary site works.

Declared commencement date 31 Aug 2026Declared commencement date 31 Aug 2026

Kenmare, Kerry

KerryKerry County CouncilCN0146501KYPlanning ref 2560490

Construct a single storey link containing a utility and en-suite between the existing house and recreational use building, construct a porch at the front of the house, construct an extension at the rear of the house, and make alterations to the house internal layout and the external elevations of the house.

Declared commencement date 31 Aug 2026Declared commencement date 31 Aug 20261 units (phase)

Clarinbridge, Galway

GalwayGalway County CouncilCN0146444GCPlanning ref 25/60313

alterations and additions to the existing dwelling house including; a new single storey side extension, the realignment of the existing driveway, the provision of a new patio area, alterations to the existing fenestration and layout of the existing house and all the associates site works.

Declared commencement date 31 Aug 2026Declared commencement date 31 Aug 20261 units (phase)
How this is counted

The five-column module groups only records with a safe PlanningBrief project match. Attached means notices present in this weekly snapshot. Because the snapshot has no populated overall scheme-unit field and notice or phase values can repeat, the displayed project value is the largest supported attached value and is never added across notices. Every notice remains in the records list with its separate stated commencement date. This page reads the frozen weekly snapshot for 31 Aug 2026–6 Sep 2026 and performs no visitor-time fetch.