Connections checked 5 September 2026. Dates below describe this edition’s events; open the planning case for its linked history and later records. See this week on the map.
Latest commencement records.
307 observed so far · Minimum observed; final count not yet available.
307 commencement notices have declared commencement dates in this ReportingWeek and match to 287 PlanningBrief projects. The count follows the official notice date, not PlanningBrief's ingest timestamp.
Largest matched commencement projects
Matched projects · non-additive project valueAll commencement notices in the latest BCMS update
307 matching recordsDublin 13, Dublin
for attic conversion with hip to gable roof and dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof windows to front all with associated ancillary works.
Passage East, Waterford
CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE
Dublin 11, Dublin
Rear extension to existing terrace house
Dublin 15, Dublin
The construction of single storey rear extension
Dublin 6W, Dublin
a) conversion of existing garage into living space, b) first floor extension to the side over existing garage, c) extension to rear of existing dwelling, d) dormer attic extension to the rear, e) demolition of sheds in rear garden and all ancillary site works to existing two storey semi-detached dwelling
Cork, Cork
Alterations and extensions to their two-storey dwelling house at 4 Ophelia Place, Lough Road, Cork, T12X3C4. Proposed works consist of: (1) Demolition of all existing rear extensions; (2) Construction of part single storey, part two storey rear extension; (3) Internal modifications; (4) And all associated site development works.
Maynooth, Kildare
The development will consist of widening the small first-floor front-facing window by c.337.5mm and the construction of a single-storey bay-window and porch extension to the front of the house and all associated site works.
How this is counted
The five-column module groups only records with a safe PlanningBrief project match. Attached means notices present in this weekly snapshot. Because the snapshot has no populated overall scheme-unit field and notice or phase values can repeat, the displayed project value is the largest supported attached value and is never added across notices. Every notice remains in the records list with its separate stated commencement date. This page reads the frozen weekly snapshot for 31 Aug 2026–6 Sep 2026 and performs no visitor-time fetch.