Site start · Co. Tipperary

Templemore, Tipperary

Site start 15 Aug 2025

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 12 Jul 2026. The details below are as they were then. The council's register has the current status.

What and where

~40 homes

change of design from that previously granted under Planning Permission Ref No. 2360219 to consist of the following alterations: A) change to house designs, B) minor change to site layout, C) change from 36 units to 40 units consisting of 16 no. 2 bed semi/terrace houses, 8 no. 3 bed semi-detached houses, 2 no. 4 bed semi-detached houses, 10 no. 1 bed duplex units and 4 no. 2 bed duplex units, D) and all associated site works

Location
Templemore, Co. Tipperary Map
Planning reference
2460342

Key facts

Homes
~40estimated from the application
Floor area
3,371 m²per planning documents
Project type
Large residential
Site start
15 Aug 2025

Documents and evidence

Check the record

  • Council planning fileThe application file 2460342 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from Design Statement in the council's file.
    Unit mix
    16 2 Bed Semi/Terrace Houses, 8 3 Bed Semi-Detached Houses, 2 4 Bed Semi-Detached Houses, 10 1 Bed Duplex Units, 4 2 Bed Duplex Units
    Floor area
    3,371 m² (per planning documents)
    Site area
    1.628 ha
    Scope
    Change of design from previous permission, increasing from 36 to 40 units with house design changes and minor site layout alterations.
    Roofing
    “traditional pitched slated roof type with gable treatment”
    Windows/doors
    “thermally broken, triple glazed PVC windows and doors”
    Rainwater
    “permeable materials lay-up surface water pipework and hydro brake system”
    Wastewater
    “connection to existing foul line at Rosemount”
    Heat pump
    “air to water heat pump”
    Groundworks
    “access road upgraded, new footpaths, foul and surface water services”

How we know this

From the Tipperary County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Site starts

Commencement notices for this permission

  1. 15 Aug 2025Work started · 22 two story houses

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Templemore

Get alerts for TemplemoreFree. We email you when new applications appear.

Free email alerts

Get new Templemore projects by email

New planning applications, decisions and site starts in Templemore, Co. Tipperary. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options