Cork, Cork
Construction of a single storey modular 2 classroom unit
58,374 project leadsApplications, appeals, tenders and recent site starts
Planning records with an estimated construction value of at least:
Estimated construction value is our estimate from floor area or stated homes and the project type, at January 2026 prices, building works only. It is never a stated figure, and a record with no estimate is not shown here. How we estimate
To see one developer's major projects, type their name in Keyword: it searches the applicant and agent named on the planning application. A record counts as changed when something we show for it changed: its decision, stage, dates, size or the people named. A day when most records changed at once is one of our own site-wide updates and is not counted.
Construction of a single storey modular 2 classroom unit
to construct a single storey type dwelling house, new entrance, boundary walls, piers and fencing, proprietary wastewater treatment unit and percolation area and all ancillary site works
Erection of single storey dwelling with waste water system at Ballyfasy Lower, Glenmore, Co. Kilkenny
Construction of a new dwelling house, on-site wastewater treatment system and all ancillary works
Construction of Replacement Dwelling House
Extension to rear of single story dwelling. Works include extension to kitchen, bedroom, en-suite, wardrobe and utility.
Construction of new dwelling and all associated works.
To construct an Opt Out Dwelling and Sewage at Inis Oirr, Baile na Formna, Co na Gaillimhe
Development which will consist of permission for change of house plans from that previously granted under planning ref. no. 2560058 consisting of a single-storey dwelling (92.18 sq m) and all associated...
The development will consist of a proposed single-storey extension to the side of an existing two-storey style dwelling, and all associated site works.
two storey extension to side and single storey extension to rear
construction of domestic garage and all associated works
New dwelling at Farranreagh, Knightstown, Valentia, Co. Kerry - Opt Out
for the demolition of existing outbuildings, the construction of a new single-storey dwelling, a new vehicular entrance off Golf Links Crescent, proposed new soakaway and all associated site works and...
Refurbishment of existing cottage & extension to rear
The works will consist of; (A) a rear and side ground and first floor extension to provide additional living space on the ground floor with new bedroom space on the first floor; (B) modification of front...
Proposed conversion and extension of existing domestic garage to new Pavillion / studio
To demolish the existing derelict house and construct a new dwelling house with a wastewater treatment plant, percolation area and all associated site works in the townland of Ballygowan.
Extension to Existing Dwelling at Tonaphubble Rd., Tonaphubble, Sligo
The construction of a dwelling house, waste water treatment system and percolation area, entrance and all ancillary site works.
Change of Use from Commercial Unit to 1 Bed Apartment at Bachelors Walk, Ballyshannon, Co.Donegal
Permission and Retention Permission for development at this site: Site to the si
Extension to existing dwelling and changes to elevation.
Maxol Limited intends to apply for permission for development to construct a new conveyor and valet car-wash facility (totalling 1,091 sq m Gross Floor Space), all at a site of approximately 0.56...
for demolition of my existing workshop and the development of a new residential development of 15 dwellings and associated works consisting of: 4 No. Type A – 4 bedroom two storey semi detached...
SHEC: 35 no. bedroom tourist hotel accommodating 224 no. bedspaces and 4 no. 2-bedroom apartment units.
Material Change of Use to Ground Floor Assembly & Recreation and First to Fourth Floor Levels Residential of the Existing Protected Structure Hendron’s Building at No’s 36 40 Dominick Street Upper...
Construction of 11 no. units having house number 12, 13, 14, 17, 18, 21, 22, 23, 24, 25, 26 out of the total 26 units. Other units were constructed in phase 1 and 2
Compliance submission for an earlier permission. Compliance with Condition No. 4 of F26A/0482E
Compliance submission for permission D24A/0644/WEB. Compliance with Condition No.4(b) of Reg Ref No. D24A/0644/WEB.
Compliance submission for an earlier permission. Compliance with Condition No. 4 of F26A/0482E
Compliance submission for permission D24A/0644/WEB. Compliance with Condition No.4(a) of Reg Ref No. D24A/0644/WEB.
Retention Permission and Permission for (A) the demolition of two existing agricultural sheds (65sqm and 49sqm); (B) the retention of two existing agricultural sheds (72sqm and 84sqm); (C) the...
RED III the development and operation of a solar photovoltaic (PV) farm with a total site area of 6.9 hectares comprising of the following – i) construction and operation of 22,500 sqm. of solar PV...
Permission for the construction of a detached fully serviced commercial garage with office space, a commercial lean-to extension to an existing building, new wastewater treatment system, staff and...
Permission to (a) construct a single storey orangery extension to the front of the Fairview Hotel and (b) alter and extend the existing gas and bin storage areas including all ancillary services and areas
the development will consist of the closure of one no. existing vehicular entrance; construction of a set-down area; reconfiguration of the existing car park; construction of external terraces serving...
to construct an additional work area extension to the rear Unit 2
for a front extension consisting of an office room and an extended reception area to an existing visitor centre and all associated site works
Permission for the construction of a two single storey warehouse units together with all ancillary site works and services at
2. The following requirements of the Conservation Division shall be adhered to: (b) Prior to the commencement of the conservation repair works, the applicant shall submit for the written approval of the...
EXPP: PROTECTED STRUCTURE: Proposed installation of 16 no. roof-mounted photovoltaic solar panels (460W each), with a total installed DC capacity of 7.36 kWp, to the existing roof of the dwelling. 2. The...
Retention planning permission for the amalgamation of Units 2 and 3 (Daybreak Convenience store) and the As Constructed Western (front) Elevation of amalgamated Unit 3 and planning permission for the...
RED III development which will consist of the installation of ground-mounted solar panels and all associated site works, this development relates to a protected structure
(1) erection of 3 no. Detached dwellings with individual wastewater treatment systems and percolation areas and (2) proposed access lane to service proposed dwellings, connection to existing services and...
To - Demolish existing haybarn and 2no. small storage buildings - Construct new stable-barn (building G) consisting of 36 No. stables, tack / feed rooms including 2 no. horse walkers & 2 no. lunging...
Renovation works to existing office building
Retention permission consists of the construction of a garden structure ('B') in the rear garden, and a dormer window to the east elevation of a separate, previously permitted, garden structure ('A') to...
RETENTION: We, Klairon Construction Limited, intend to apply for retention planning permission to the development at Sandymount Place, Sandymount Avenue, Sandymount, Dublin 4. The site is bound to the...
2. The development shall comply with the following requirements of the Conservation Section: b) Prior to the commencement of the development, the applicant shall submit revised drawings / documentation...
Save it to your account, or get an email when new project leads match it.
Save this search