Dublin 2, Dublin
Phase 1: Rear Façade: (1) Restoration of 3 historic windows to the rear, reinstatement of missing Georgian windows, replacement of modern doors and windows (3)possible Replacement of some granite cills...
Co. Dublin
281 planning applications · 407 site starts · latest 16 Nov 2026
Page 7 of 7 · newest first
Phase 1: Rear Façade: (1) Restoration of 3 historic windows to the rear, reinstatement of missing Georgian windows, replacement of modern doors and windows (3)possible Replacement of some granite cills...
Extensions to office building on 4th & 5th floor level and new 6th floor level resulting in a 7 storey building. Plant areas at 4th floor level, sedum roof at 6th floor level and all site works.
Re-Fit of a Retail Unit, Grafton Street
Fit-out of existing shell and core premises to office at 3rd Floor, 1 Windmill Lane, D2
Removal of existing car park ramps to basement -2 and -1 and replacement with 2 no. car lifts and 1 no. bicycle lift and relocation of the existing access gates on to Cope Street. Decommissioning of 100...
In Dublin 2
In Dublin 2
Dated since 1 Nov
Newest record date
165 of 688 · then Protected structure, Change of use
Earlier records
Works include partial demolition of existing structures on site and boundary treatments including: Demolition of the single storey red brick structure fronting Sir John Rogerson's Quay (nos. 20-24)...
Refurbishment and alterations to Entrance Level Apartment involving (a) reinstating ope in central spine wall to original proportions and fitting new timber panelled doors with architraves, (b) blocking...
Fit out of coffee shop at ground floor and basement
Basement fit out for use as public house with food service
The development will consist of alterations to existing ground floor shopfront and new illuminated fascia sign to 24 Grafton Street, Dublin 2, a Protected Structure.
PHASE 1 The development will consist of associated internal and elevation alterations to No. 41A Pleasants Street; all hard and soft landscaping; changes in level; associated site servicing...
Demolition of existing single storey extension to the rear at lower ground floor level and the construction of a new 39 sq/m two storey extension to the rear. Two no. rooflights to the rear field of...
Proposed Construction of Blocks E & F (Retail, Assembly & Recreation and Residential) part of development to be known as Capital Dock.
Internal alterations comprising the reconfiguration of the ground floor reception area to provide additional space to the existing fitness theatre. Internal alterations to multi-purpose and staff common...
New internal fitout of ground floor and areas of lower basement of existing office building, comprising new reception desk, open plan offices, meeting rooms, bleacher seating in existing atrium and...
Proposed Construction of Block D as part of the development to be known as Capital Dock.
Material change of use and extension to the rear of an existing Protected Structure including all associated site works at 24 Earlsfort Terrace, Dublin 2.
Conservation and refurbishment of two connected protected structures to provide supported temporary accommodation with 30 bed spaces. Works to include the strip out of existing building, fire upgrading...
National Concert Hall works; Demolition work, building work and alterations to an existing Protected Structure, together with re-servicing work externally and internally, and works to roofs and other...
Amalgamation of eight number existing bedsits into four number one bedroom apartments at Senior Citizens Complex, Block 1, St Andrews Court, Fenian Street, Dublin 2.
change of use from office use to single family residential use; construction of new single storey extension to rear; replacement of shed construction to upper first floor return with solid/masonry...
Internal refurbishment works to existing office block 'C', Ardlaun House, St. Stephens Green, Dublin 2. Works include replacing M&E fitout, new ceilings and decoration works.
Change of Use of 1st Floor Level from Office to Retail/Demonstration area
Office fit out at 5th floor, One Grand Canal Square
The demolition of existing structures on site including the red brick single storey building fronting Sir John Rogerson's Quay (nos. 20-24) and annexes to the rear of the 3-storey original office...
The proposed development will consist of the amalgamation of the two exsting retail units at basement and ground floor levels into one retail unit measuring 341m2
This SFCN relates to site set-up and demolition of existing structures only including localized excavation to the project. No permanent development will be undertaken under this short form commencement...
Refurbishment of existing office reception area to include new draught lobby, new lighting, new reception desk and associated works
The development will consist of the construction of 3no. prefabricated container based box units and all ancillary preparatory works for the insertion of the prefabricated units underneath the existing...
Change of use from pharmacy to Pablo Picante Restaurant incorporating hot food takeaway and all associated works/services all at Ground Floor, Unit 3, 14-18 Aston Quay, Dublin 2
Third floor office fit out works to include cellularization of an existing open office space to include a canteen, meeting rooms, offices and open office workstation areas
Material alterations to a college at third floor, 60-63 Dawson Street. The works consist of a refurbishment of the floor to include three Lecture Rooms and a Recreation Room, with associated circulation...
Use of the existing ground floor of the extension to the rear of the NMH for a new Triage Department, together with associated works at the National Maternity Hospital, Holles Street, Dublin 2
Extension to the ground, 2nd, 3rd and 4th floor at 5 Schoolhouse Lane, Dublin 2
CAT A Office Fit-out works on 2nd and 3rd floor and CAT B Office Fit-out works to Lower Ground, Ground and 1st Floor. Works comprise installation of carpets, ceilings, wall finishes, M&E services...
Existing GBK Restaurant refurbishment, 5 Annes Street(Protected Structure Section 5 Grant Ref 0389/16)Dublin 2 including the decoration, new furniture, Interior finishes and painting.
PROTECTED STRUCTURE: For the amendment to existing layout of second floor to create one bed apartment (area=55m2), and commercial kitchen; with change to eastern courtyard elevation to allow for new door...
Proposed internal refurbishment of the mews at No. 13 Upper Mount Street, Dublin 2
Remedial restoration and repair works.
Cat B fit out of existing office buildings Blocks B & C Miesian Plaza, 50-58 Baggot Street covered under previously granted FSC
Refurb of existing two storey office building to include minor demolitions, new windows, new floor finishes, new ceilings, new wall finishes, internal and external painting and decoration, replacement of...
Construction of new community building for Grace Bible Fellowship comprising four to two storeys over basement level. Construction of seven storey extension to Trinity City Hotel to rear from second to...
Construction of new 6 storey over basement Office Building, with 1no. own door Commercial Unit at ground level, 10-12 Hogan Place (Corner of Hogan Place and Harmony Row) Dublin 2.
Demolition of the existing eight storey (including full height plant room) office building on the site and its replacement with a part seven part eight storey office building over one level of basement.
Permission and change of use and retention of use at 100 St Stephen’s Green, Dublin 2. The development will consist of: Restoration, refurbishment, modifications and change of use to office at ground...
Renovation and extension of an existing reception area at the complex involving amalgamation with an adjacent unused retail unit located within the development. Works to include alterations to the glazed...
8, Hanover Quay, (Former Durabond House building), Hanover Quay, Dublin 2 (The Reflector) The project consists of a mixed use office and residential development on a site of c. 0.43 hectares located at...
Alterations to existing basement to provide Restaurant Accommodation to the Cliff Townhouse, 22 St Stephens Green North
Alterations to an existing Finance/HR administration area into a dedicated Cataract Theatre on the ground floor area at the rear of the building and provision a new Plant Room at the rear of the site.
Conservation refurbishment, redevelopment and reuse of the existing marine based industrial/warehouse building including provision of a public boardwalk over the existing quay wall...
Material alteration and extension to the rooftop of Trinity City Hotel at Pearse St, Dublin 2.
13-18 City Quay Shell & Core Mixed Use Development. The proposed development comprises a new eight storey office building with own door commercial units at ground floor located over a single storey...
Change of use from retail use to restaurant use of the ground floor and two storey extension to rear at 33 Charlemont Street, Dublin 2.
The development consists of a six storey office building (Ground + 5 upper levels) over three levels of basement (Basement-2, Basement-1 and Lower Ground Floor)
Material Alterations consisting of the Fit-out of 5th and 6th Floors of Cumberland House, Fenian Street, Dublin 2 on foot of which FSC 1277/16 and Revised FSC 1775/16/Rev have been granted
Provision of stores within basement associated with office fit out to floors above at 7 Hanover Quay, Dublin 2
Installation of 1 no. external non- illuminated matt- painted aluminium panel sign
Material alterations to hotel reception and main lobby
The proposed works will comprise of stripping out and refurbishment/alteration of the existing upper floor office areas while maintaining live access to the ground floor retail unit. Removal of elevation...
The development consists of the removal of existing tarmacadam surface and substrate in front of the Graduate Memorial Building (Protected Structure) and replacement with new sub surface and stone paving...
Miesian Plaza Block 1 (formerly Block A) - Plant Room enclosure extension and construction of a lift to the 8th floor plant level and green roof; comprising of sedum planting and all associated site...
The works involve the material alteration / extension to a building. The existing fifth floor consists of plant. The office accommodation will be extended to this level. There are minor alterations...
The development will consist of internal alterations to existing restaurant and provision of a new external window opening with fenestration to the facade facing Swan Yard.
Amalgamation of Units 9-11 Block S, Spencer Dock, Dublin 1 and change of use from retail to office use
Phase 2 - Material alteration comprising the following: a) partial infill of an existing atrium on the first, second and fourth floors to provide additional floor space. Overall additional floor area...
Refurbishment of a commercial use to an existing mew structure. Works will include the replacement of the roof to the front and side of the mews structure and the replacement of the windows and doors...
Removal of the existing toilet facilities and the provision of new accessible toilet facilities within a single storey extension, internal alteration within the bar to include the refurbishment of the...
Alterations to former RIC/Dublin Metropolitan police Barracks, 4A Lad Lane, Dublin 2: Development consisting of: (a) Alterations to internal layout of ground floor to provide 2 No. office suites...
Upgrade and alterations to existing ground floor and first textile units at Dunnes Stores Stephen Green Dublin 2
PROTECTED STRUCTURE: The development will consist of; change of use of the ground floor premises from Retail (Bank) to online delivery restaurant, including new glass door to inner frame of existing...
Refurbishment Works to existing Maldron Hotel, Pearse Street, D2, for Suvanne Management Ltd. Third floor – existing hotel gym & office room area remodeled and extended to provide 4No new bedrooms Third...
Basement and four storey extension to rear of existing five storey over basement School
Construction of a new 9 sqm extension at sixth floor level and a new 220 sam extension at seventh floor level of the existing eight story building
Refurbishment works to first floor unit at 14/15 Camden Street Lower, Dublin 2.
Opening in Party wall in existing building to access adjacent unit. Office use only.
Alterations to approved scheme, reg. ref. no. 2123/09 [which granted permission for the demolition of the existing four storey over basement building, JWT House, 8–11 Lower Baggot Street; substantial...
It is proposed to subdivide the existing unit, extending over the entire second floor of the building into two separate units which will be used by different tenants. The two units will share two of the...
The proposed works comprise of new changing areas on ground floor, insertion of new floor within previous squash courts to level 02 along with new platform lift, all at property formerly known as the St...
General alterations to foyer including demolition of wall to widen foyer and creation of new lobby to stairs and related alterations
BJ Marine: change of use from former marine based industrial/warehouse use to provide an open community digital applications academy and e-learning web resource public amenity. The proposed use...
Change of Use, Remodel & Extension of entirety of First and Second floors and part of ground and basement floors to form new residential unit at existing three storey over basement terraced building.
Renovation of existing second floor level apartment to include provision of mezzanine level with stairs, upper floor storage / living space, installation of velux windows / roof lights, chimney / flue...
PROTECTED STRUCTURE: The development will consist of amendments to previously approved permission (Reg Ref 2028/10) for demolition of the existing single storey WCs and external fire escape stairs to the...
Part change of use, alterations & extensions to existing 3 storey over basement building of 850.5 sq.m comprising wholesale showrooms, workshop, srockrooms and offices to provide a licensed cafe bar.
Material alteration/material change of use: change of use of portion of basement to relocate previous 2nd floor kitchen at basement level, together with a material alteration in the form of a new second...
Relocation of shopfront to provide exterior terrace, relocation of internal doorway between hotel lobby and restaurant, alterations to existing kitchen to provide new opening to restaurant.
Allied World Assuranc eCompany intend to carry out works to the interior of the building.
Internal and external alterations to 4 storey over basement structure to front and two to three storey stairs at rear to include:Construction of new stairs from basement to second floor with new roof and...
Council
Nearby
Explore